James Street Pump Station

Project Description:

James Street Pump StationThis is the last phase of a three-phase project that will help to alleviate flooding on James Street by diverting storm water to the Green River.  This area has experienced seasonal flooding that affects nearby properties, and can close James Street during heavy rainfall. 


Phase I and II have been completed.  Under Phase I, the City installed storm water pipes along Central Avenue from Titus Street to the Kent Courthouse.  Under Phase II, the City connected the storm pipe from Phase I to the new pump station site. 


In Phase III, the pump station will be installed at James Street.


See a map of the project locations (PDF, 3MB)

Timeline of Events:

Phase III

Winter 2016 - Advertise for bids and begin construction

Summer 2016 - Complete construction

Estimated Construction Costs:

$1.6 million


To be determined

Project Engineers:

Garrett Inouye, P.E.
(253) 856-5548


Kelly Casteel, P.E.

(253) 856-5561


Construction Inspector:

To be determined